Please use this identifier to cite or link to this item:
http://edoc.bseu.by:8080/handle/edoc/85042
Title: | A global constraint model for Integrated routeing and scheduling on a transmission network |
Authors: | Ros, L. Creemers, T. Tourouta, E. Riera, J. |
Keywords: | constraint logic programming;transmission networks;routeing;сети передачи |
Issue Date: | 2001 |
Publisher: | Белорусский государственный экономический университет |
Language: | Английский |
Type: | Article |
Citation: | A global constraint model for Integrated routeing and scheduling on a transmission network / L. Ros [и др.] // Информационные сети, системы и технологии = Information Networks, Systems and Technologies : в 3 кн. Кн.1 : Труды международной конференции ICINASTe'2001, Минск, 2-4 октября 2001 г. : на англ. яз. / Ред.: А.Н. Морозевич [и др.]. - Мн. : БГЭУ, 2001. - С. 40-47. |
Abstract: | This paper presents a novel approach to planning the sending of messages along a meshed transmision network with limited bandwidth paths. The approach allows determining the topological routing of messages and a feasible time schedule satisfying three basic constraints: maximum bandwidth capacity per path, integrity of packages and maxi receiving time for each message. Constraint Logic Programming (CLP) is used to solve the combined problem o f routeing and scheduling in an integrated manner. |
URI: | http://edoc.bseu.by:8080/handle/edoc/85042 |
ISBN: | 985-426-692-3 |
Appears in Collections: | Информационные сети, системы и технологии = Information Networks, Systems and Technologies |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Lluis_Ros_40-47_.pdf | 493.41 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.